ACCIONA Construcción began operating in 2013 with the Specialised Dr Rafael Hernandez Hospital Centre in the district of David.


Projects

Pan-American highway, Bridge of the Americas – Arraiján section

Pan-American highway, Bridge of the Americas – Arraiján section

Study, design, construction and maintenance on works for the expansion and renovation of the Pan-American highway, bridge of the Americas – Arraiján section, Panamá oeste province.

  • This is one of the most important roadway projects in the country, offering a mobility solution to the residents of the Panamá Oeste province. Residential bedroom community, as most residents spend their days in Panama City. The traffic jams that affect access to the city on the current road make residents lose nearly 2 hours of their time in each direction.
  • The length of the project is nearly 12 km. It consists of building a highway through areas traversed previously by the current one. It will have 3 lanes in each direction, plus 2 central lanes that can be reversed as required operationally. There will also be 6 new junctions.
Rafael Hernandez medical specialities centre

Rafael Hernandez medical specialities centre

Technical studies, urban and architectural designs, plan creation and approval, and construction of the Dr. Rafael Hernandez medical specialities centre, located in the district of david.

  • One of the country’s largest hospital projects.
  • Once built, it will have 56,500 m2 of floor area
  • There will be 331 beds.
  • It will be the primary hospital in the Chiriquí province.
Sabanitas II WTP

Sabanitas II WTP

Study, design, construction, operation and maintenance of the Sabanitas II Water Treatment Plant.

  • Plant capable of treating 1.31 m3/sec (30 MGD).
  • The adduction line will be 48 inches in diameter and 1.4 km long.
  • The adduction line is some 8.80 km long and will include variable-diameter pipes, from 48 to 12 inches.
Ing. José G. Rodríguez WTP

Ing. José G. Rodríguez WTP

Study, design, construction, operation and maintenance of the Ing. José G. Rodríguez Water Treatment Plant.

  • Plant capable of treating 1.75 m3/sec (40 MGD).
  • The adduction line will be 60 inches in diameter and 17.88 km long.
  • The adduction line is some 18.80 km and will include variable-diameter pipes, from 60 to 24 inches.

Contact

JAIME VEGA DIAZ DEL RIGUERO

Country Manager

jaime.vega.diaz.riguero@acciona.es
+507 214 42 47
Calle 50 Torre Global Bank- Piso 23, Oficina 2303 Ciudad de Panamá - Panamá