4D Planning

Traditional organisation and time management tools in a construction project make it possible to represent the technical team’s ideas and projections in a document.

Every element of the BIM model is linked to the works schedule, which enables an exhaustive control process of the phases, adjusting times according to the model. Likewise, it makes it possible to automatically view the progress of the works carried out.

The link of this planning to BIM also makes it possible to verify and ensure that this planning is realistic. This is possible because said planning is restricted to the real limitations of the works.

Automation And Collaboration

Automation And Collaboration

The use of BIM makes it possible to simulate real construction from the first stages

 Base de datos As Built

Base de datos As Built

The final aim of the model is to offer the client an as-built BIM model with all of the relevant information for infrastructure management and maintenance.