    New Container Base at the East Dock

    This project consisted of the construction of a mooring line approximately 320 m long, with a 16-m draft depth, running from the current ramp of the Bufadero Container Base, following an approximately parallel alignment with the current wharf of the eastern container terminal.

    General Information

    Location
    Canary Islands, Spain
    Contract type
    Construction
    Infrastructure
    Mooring line approximately 320 m long, with a 16-m draft depth
    Year of project completion
    2008

    discover other flagship projects

    Clean Energy Project Site C

    British Columbia, Canada

    One of the biggest dams in Canada.

    Outer Port of El Ferrol

    Galicia, Spain

    New Port with a sheltered area of 100 hectares in the outer area of the estuary of El Ferrol. A Coruña. Spain.