    Port of Tarragona Breakwater Sea Wall

    It is a vertical dike made of precast reinforced concrete caissons with a length of 67 m, a width of 24 m. and a depth of 322.5 m. 

    The connection of the new dike to the current one is comprised of a sloped dike with protection made of concrete blocks weighing 39 and 59 tons. 

    General Information

    Location
    Tarragona, Spain
    Contract type
    Construction
    Infrastructure
    Vertical dike made up of precast reinforced concrete caissons with a length of 67 m, a width of 24 m and a depth of 322.5 m
    Year of project completion
    2007

    discover other flagship projects

    Clean Energy Project Site C

    British Columbia, Canada

    One of the biggest dams in Canada.

    Outer Port of El Ferrol

    Galicia, Spain

    New Port with a sheltered area of 100 hectares in the outer area of the estuary of El Ferrol. A Coruña. Spain.

    Move up