    Rota Naval Base

    This project involved the construction of a 306.5-m long gravity wall aligned with the existing wharf along with an 80-m wide,430-m long and 15-m deep docking pit.

    The Rota Naval Base has been operational since the 1950s when it was completed, and since then no project of this scope has been undertaken. The last section was completed in 1985, with a reinforced concrete caisson structure. The useful life of this kind of port infrastructure tends not to exceed 25 years, which is why it is extremely important to carry out continuous upgrading projects in order to keep its functionality and effectiveness up-to-date.

    The project started on October 15, 2007, and during execution, a modified project had to be drafted, as a result of the extension of the draft depth of the docking pit to -15.00 metres, which also meant including rigid structures on the seabed to ensure the stability of the wharf.

    General Information

    Location
    Rota, Spain
    Contract type
    Construction
    Infrastructure
    306.5-m long gravity wall aligned with the existing wharf, and a 80-m wide docking pit
    Year of project completion
    2010

    discover other flagship projects

    Clean Energy Project Site C

    British Columbia, Canada

    One of the biggest dams in Canada.

    Outer Port of El Ferrol

    Galicia, Spain

    New Port with a sheltered area of 100 hectares in the outer area of the estuary of El Ferrol. A Coruña. Spain.

    Move up