We use proprietary and third-party cookies to improve our services and show you advertising related to your preferences through analysis of your browsing habits. If you continue browsing, we consider that you accept their use. You can get more information, and find out how to change your settings, in our Cookies Policy

What are you searching?

    Track bed for the new basque country railway network. Section: Antzuola-Ezkio/Ezkio oest. Guipuzcoa

    Track bed for the new basque country railway network. Section: Antzuola-Ezkio/Ezkio oest. Guipuzcoa

    Track bed for the new basque country railway network. Section: Antzuola-Ezkio/Ezkio oest. Guipuzcoa

    Location:

    • Antzuola and Zumárraga.Basque Country.Spain.

    Acciona’s Role:

    • Construction

    Infrastructure:

    • The construction project defines the route and the infrastructures required for the new high-speed line in order to construct the railway track bed for the Antzuola-Ezkio/Itsaso section from the western side of Antzuola.
    • The section is 3.56 km long, with 2.5 km in twin tunnels with connecting atriums (5 in total), 0.5 km as viaduct and the remainder as embankments/levelled land with the associated walls.
    • The tunnels are 5.2 km in total, of which 48% belong to our section.
    • The subsection belongs to the Guipuzcoano branch line and the “Y Vasca” line and is located in a mountainous area, successively crossing the Deba and Urola valleys and the Deskarga and Oiarbide rivers.

    Completion date:

    • 2018

    discover other flagship projects

    Dubai Metro 2020

    Dubai, United Arab Emirates

    Design and construction of the extension of the Metro Red Line from Nakheel Harbour Station to the future site of the World Expo 2020.

    Quito Metro. Second Phase

    Quito, Ecuador

    22-km tunnel that will become the first line of Quito Metro. Ecuador.

    Move up