We use proprietary and third-party cookies to improve our services and show you advertising related to your preferences through analysis of your browsing habits. If you continue browsing, we consider that you accept their use. You can get more information, and find out how to change your settings, in our Cookies Policy

What are you searching?

    New basque country railway network. Section: Legorreta

    New basque country railway network. Section: Legorreta

    New basque country railway network. Section: Legorreta

    Location: 

    • Guipúzcoa.Basque Country.Spain.

    Acciona’s Role

    • Construction

    Infrastructure:

    • The section of the new railway network runs southwest-northeast, crossing land belonging in the municipalities of Itsasondo, Legorreta and Tolosa, in Guipúzcoa province.
    • The route is 3,585 m long., between kilometre markers 206+890 and 210+475.Almost the entire section is through tunnels, with a total length of 2,941 m, while the remainder is via two viaducts over the Zubina and Lasarte rivers, which are 144 m and 382.6 m long respectively.
    • The length of the tunnel (2,941 m) and the safety recommendations for railway tunnel infrastructures requires two interim evacuation atriums, which are 40 m and 140 m long respectively.
    • The corresponding emergency platforms are located in the adjoining areas or at the exits. Furthermore, the decks of the two viaducts, which connect to the planned emergency platforms at either end, have also been taken into account to evacuate the tunnels in the event of an incident.

    Completion date

    • 2014

    discover other flagship projects

    Dubai Metro 2020

    Dubai, United Arab Emirates

    Design and construction of the extension of the Metro Red Line from Nakheel Harbour Station to the future site of the World Expo 2020.

    Quito Metro. Second Phase

    Quito, Ecuador

    22-km tunnel that will become the first line of Quito Metro. Ecuador.

    Move up