    ACCIONA participated in the construction of all three sections of the project. From Olmedo to Zamora: 32 km of dual track, 7 viaducts, 10 overpasses and 12 underpasses. From Vigo to Das Maceiras: 7 km of dual track and two 10.9-km long twin tunnels. From Zamora to Lubian: 42 km of dual track, 2 tunnels (1.7 km and 2.4 km) and 2 bridges. These project sections were completed in 2009, 2010 and 2012, respectively.

    It is a new 435-km long route, installed with UIC-gauge double electrified track (1.4 mm) and ASFA and ERTMS signalling.

    General Information

    Location
    Madrid-Galicia, Spain
    Contract type
    Conventional acquisition
    Infrastructure
    435-km long route, installed with UIC-gauge double electrified track (1.4 mm) and ASFA and ERTMS signalling
    Year of project completion
    2012

    discover other flagship projects

    Follo Line Railway Tunnels

    Oslo, Norway

    The largest railway project in Norway 

    Legacy Way Tunnel

    Queensland, Australia

    4.6-km tunnels in the city of Brisbane. Australia.