- Railways and Tunnels
- Madrid-Galicia High-Speed Rail
ACCIONA participated in the construction of all three sections of the project. From Olmedo to Zamora: 32 km of dual track, 7 viaducts, 10 overpasses and 12 underpasses. From Vigo to Das Maceiras: 7 km of dual track and two 10.9-km long twin tunnels. From Zamora to Lubian: 42 km of dual track, 2 tunnels (1.7 km and 2.4 km) and 2 bridges. These project sections were completed in 2009, 2010 and 2012, respectively.
It is a new 435-km long route, installed with UIC-gauge double electrified track (1.4 mm) and ASFA and ERTMS signalling.
Design and construction of the extension of the Metro Red Line from Nakheel Harbour Station to the future site of the World Expo 2020.
22-km tunnel that will become the first line of Quito Metro. Ecuador.