We use proprietary and third-party cookies to improve our services and show you advertising related to your preferences through analysis of your browsing habits. If you continue browsing, we consider that you accept their use. You can get more information, and find out how to change your settings, in our Cookies Policy

What are you searching?

    Madrid-Galicia High-Speed Rail

    ACCIONA participated in the construction of all three sections of the project. From Olmedo to Zamora: 32 km of dual track, 7 viaducts, 10 overpasses and 12 underpasses. From Vigo to Das Maceiras: 7 km of dual track and two 10.9-km long twin tunnels. From Zamora to Lubian: 42 km of dual track, 2 tunnels (1.7 km and 2.4 km) and 2 bridges. These project sections were completed in 2009, 2010 and 2012, respectively.

    It is a new 435-km long route, installed with UIC-gauge double electrified track (1.4 mm) and ASFA and ERTMS signalling.

    General Information

    Location
    Madrid-Galicia, Spain
    Contract type
    Conventional acquisition
    Infrastructure
    435-km long route, installed with UIC-gauge double electrified track (1.4 mm) and ASFA and ERTMS signalling
    Year of project completion
    2012

    discover other flagship projects

    Dubai Metro 2020

    Dubai, United Arab Emirates

    Design and construction of the extension of the Metro Red Line from Nakheel Harbour Station to the future site of the World Expo 2020.

    Quito Metro. Second Phase

    Quito, Ecuador

    22-km tunnel that will become the first line of Quito Metro. Ecuador.

    Move up