We use proprietary and third-party cookies to improve our services and show you advertising related to your preferences through analysis of your browsing habits. If you continue browsing, we consider that you accept their use. You can get more information, and find out how to change your settings, in our Cookies Policy

What are you searching?

    Quito Metro. Second Phase

    22-km tunnel that will become the first line of Quito Metro. Ecuador.

    The layout of the first underground line in Ecuador’s capital is 22 km long and has thirteen new stations which are added to the two that have already been built by ACCIONA.

    The line will also feature workshops and the railway facilities needed for its proper operation. The contract includes the integration and implementation of systems.

    The underground line runs from the current Quitumbe bus terminal at the south of the city to the station of El Labrador, located at the north, on the grounds of the former airport.

    Phase I of Quito Metro, also carried out by ACCIONA, involved the construction of the stations of El Salvador and La Magdalena.

    AIM

    Streamlining the passenger transport system of the city of Quito. This first line is the first element of a new public transport system in Quito.

    BENEFIT

    The project will involve savings of up to US $50 million per year in fuel for improvements in urban transport, with a subsequent reduction of 67,000 tonnes of CO2.

    IT INCLUDES

    The integration and implementation of systems.

     

    Design, assembly and use of tunnel boring machines to build our future world

    AIM

    Streamlining the passenger transport system of the city of Quito. This first line is the first element of a new public transport system in Quito.

    BENEFIT

    The project will involve savings of up to US $50 million per year in fuel for improvements in urban transport, with a subsequent reduction of 67,000 tonnes of CO2.

    IT INCLUDES

    The integration and implementation of systems.

    General Information

    • Location:Quito. Ecuador
    • Contract type:Construction 
    • Infraestructure:22-km tunnel, 13 new stations, garages, workshops and railway facilities necessary for commissioning.
    • Year of project completion: 2019

    News

    discover other flagship projects

    Dubai Metro 2020

    Dubai, United Arab Emirates

    Design and construction of the extension of the Metro Red Line from Nakheel Harbour Station to the future site of the World Expo 2020.

    Follo Line Railway Tunnels

    Oslo, Norway

    The largest railway project in Norway 

    Move up