    A-2 Motorway Section: Ring Road 2 - L.P. Soria-Guadalajara

    Concession for the construction, renovation, restoration and conservation of an existent shadow toll road measuring 76.50 km long, in the section between the Ring road 2 (Guadalajara) and the provincial border with Soria.

    In the 76.50-km section, the A-2 motorway is the main artery of the Spanish road network, linking the cities of Madrid and Barcelona.

    The works expected in the road are classified according to the following three areas:

    • Area 1: Renovation and first set-up.
    • Area 2: Replacement works and intensive repair.
    • Area 3: Operation works and maintenance of the road.

    The concession will be completed in 2026.

    General Information

    Location
    Aragón, Spain
    Contract type
    Construction, remodelling, restoration, operation and maintenance
    Infrastructure
    Rehabilitation and maintenance of existing A-2 road measuring total length of 76.50 km.
    Year of project completion
    2009

    discover other flagship projects

    Toowoomba Motorway. Second Range Crossing TSRC

    Queensland, Australia

    41 km bypass motorway north of the city of Toowoomba in the state of Queensland. Australia.

    A-30 Motorway

    Quebec, Canada

    42 km of motorway in Montreal between Vaudreuil-Dorion and Châteauguay. Canada.

    Move up