    Ebro Bridge

    The foundation, made of piles and abutments, was executed by means of piles with a diameter of 1.50 metres and depths ranging from 17 to 26 metres.

    It was designed in such a way that it allows for future expansion to three lanes, and a 0.75-m sidewalk was created next to the 2.50-m hard shoulder, allowing any drivers whose cars have broken down, or any other person, to walk safely along the road should the General Council of Aragón deem it necessary.

     

    General Information

    Location
    Zaragoza, Spain
    Client
    Government of Aragón (End Client). Concessionaire: Sociedad Concesionaria Puente del Ebro, S.A.
    Contract type
    Design, construction, operation and maintenance(PPP)
    Infrastructure
    Structure for crossing over the River Ebro: The viaduct crossing over the River Ebro has a total length of 400 m, and has two parallel viaducts made up of 10 spans of 40 m each, executed with decks for each carriageway on prefabricated double T-beams and a compression slab, with a maximum height of 15 m
    Year of project completion
    2008

    discover other flagship projects

    Toowoomba Motorway. Second Range Crossing TSRC

    Queensland, Australia

    41 km bypass motorway north of the city of Toowoomba in the state of Queensland. Australia.

    A-30 Motorway

    Quebec, Canada

    42 km of motorway in Montreal between Vaudreuil-Dorion and Châteauguay. Canada.

    Move up