    Access bridge to Micro Hydroelectric Plant in Iboundji

    Construction of a bridge using composite materials by ACCIONA Construction's Technology Centre for access to the microhydroelectric plant of Iboundji, Gabon

    This is the first bridge built with composite materials in Gabon. It is 17 metres long and 6 metres wide, consisting of two continuous channel beams made from carbon fibre.

    General Information

    Location
    Iboundji, Gabon
    Contract type
    Construction
    Infrastructure
    Composites bridge measuring 17 metres long and 6 metres wide, consisting of 2 continuous channel beams made from carbon fibre.
    Year of project completion
    2014

    discover other flagship projects

    Toowoomba Motorway. Second Range Crossing TSRC

    Queensland, Australia

    41 km bypass motorway north of the city of Toowoomba in the state of Queensland. Australia.

    A-30 Motorway

    Quebec, Canada

    42 km of motorway in Montreal between Vaudreuil-Dorion and Châteauguay. Canada.

    Move up