    Nose Hill Interchange

    Primary contractor responsible for the construction of the project.

    The design was provided by Alberta Transportation, although there were several specific items that needed more in-depth design (bearings, expansion joints, MSE walls, steel diaphragms, etc.). Therefore, our construction team also took care of this part of the design, together with our suppliers and with the support of our engineering company, ACCIONA Ingeniería.

    General Information

    Location
    Calgary, Alberta, Canada
    Contract type
    Design and construction
    Infrastructure
    2.9 km north to south, and 1.6 km east to west. 2 new bridges of 165 m and 150 m respectively, as well as the widening of an existing 166-metre bridge, from 4.2 metres to 11.2 metres
    Year of project completion
    2014

    discover other flagship projects

    Toowoomba Motorway. Second Range Crossing TSRC

    Queensland, Australia

    41 km bypass motorway north of the city of Toowoomba in the state of Queensland. Australia.

    A-30 Motorway

    Quebec, Canada

    42 km of motorway in Montreal between Vaudreuil-Dorion and Châteauguay. Canada.

    Move up