    Sogama

    ACCIONA diseñó y construyó las instalaciones de la planta de waste to energy SOGAMA, el Complejo Medioambiental de Cerceda, en La Coruña.

    SOGAMA's urban solid waste (USW) treatment plant was built to transform non-recyclable USW into a type of refuse-derived fuel (RDF), to later be treated in a steam/water cycle boiler for electricity production.

    With a total capacity of 50 MW and an input of 488,000 tonnes of urban solid waste per year, the plant is divided into four parts:

    • Yellow Bag Classification Plant (PCBA in Spanish): Light Packaging Recycling Plant.
    • Recycling, Treatment, and RDF Preparation Plant (PRTE in Spanish).
    • Cogeneration Plant (PCOG in Spanish): Six groups of generators producing a total of 21.21 MWe.
    • Thermoelectric Plant (PTE in Spanish).
    In addition, we provided services related to the construction of two water treatment plants, a dumping site for inert slag, and an electrical substation.

    GENERAL INFORMATION

    Location
    La Coruña, Spain
    Client
    Sociedade Galega Do Medio Ambiente
    Thermoelectric capacity
    50 MW
    Technology
    Waste to energy

    KEY FIGURES

    • 488,000 tonnes of USW per year

    • Electrical cogeneration capacity of 21.21 MW

    • Thermoelectric generation capacity of 50.00 MW

    • Estimated production of 515,000 MWh per year

    discover other flagship projects

    Vigo Hospital

    Galicia, Spain

    The €370-million Vigo Hospital represents the largest investment made in a health centre facility currently in construction in Spain.

    New corporate headquarters for BBVA in Madrid

    Madrid, Spain

    Building architecture designed by Herzog and de Meuron.

    Move up