We use proprietary and third-party cookies to improve our services and show you advertising related to your preferences through analysis of your browsing habits. If you continue browsing, we consider that you accept their use. You can get more information, and find out how to change your settings, in our Cookies Policy

What are you searching?

    Monovar-Novelda Platform

    Monovar-Novelda Platform

    New High-Speed Railway access to Levante. Madrid - Castilla La Mancha – Valencia Region – Murcia Region. Monovar – Novelda Section.

    GENERAL INFORMATION

    Location

    • Novelda, Alicante

    Acciona’s role

    • Construction

    Infrastructure:

    • Length of section: 4.97 km.
    • Construction of the railway infrastructure and superstructure, including:
    1. Viaduct over the Encina-Alicante and Barranco de Salinetas railway. 1,259 metres long.
    2. Viaduct over the Barranco de los Baladres and the A-31 highway. 681 metres long.
    3. Four underpasses.

    Value of the project

    • 52 million euros

    Completion date

    • 2010

    discover other flagship projects

    Dubai Metro 2020

    Dubai, United Arab Emirates

    Design and construction of the extension of the Metro Red Line from Nakheel Harbour Station to the future site of the World Expo 2020.

    Quito Metro. Second Phase

    Quito, Ecuador

    22-km tunnel that will become the first line of Quito Metro. Ecuador.

    Move up